8 September 2010

Construction Complete; Asthetics Are Next

January 2, 2009 · Mapping · TF2 · 0 Comments

Wireframe Image

As you may or may not be able to tell from the above image, the main construction of the map is finally complete. The very center is the train that travels through the level. The masses on the left and the right are the first two points. The final point is in the square at the very bottom.

As more of the map is completed, i will post more pictures.

P.S. Happy New Year.